|
|
| |
|
| |
News Updates: December 2005
All updates
from the month of December 2005 are listed below.
Natick pondering uses of mall money
Written by Justin on December 18, 2005 at 1:41AM
Lowe's construction well under way
Written by Justin on December 18, 2005 at 1:36AM
- Just a small tidbit for
December so far, but if you've been out on Route 30, the Lowe's
building is really starting to take shape. The remains of the Verizon
building are but a distant memory, and the steel framing appears to be
entirely up. If you look closely, you can see that the more steel
appears to more present than in most construction sites; this is likely
to be needed as there will be many cars will be parked on top of the
building.
- You can also track the Lowe's
permitting process online at http://www.framinghamma.gov/Permit_Property/PermitsPage1.aspx?Street_No=350&Street=COCHITUATE%20RD.
|
©
Copyright 2006 Framingham/Natick Retail and Tardiff.net. All Rights
Reserved.
|